CWC Water Distribution
We were chosen to provide design and construction engineering services for various water distribution system improvements at the Central Wisconsin Center (CWC) located in Madison, Wisconsin. The project included installation of over 7,300 ft of water main including associated hydrants, valves, and fittings. It also included upgrading several existing building water services including double check assemblies for fire protection systems. Close coordination with the facility was needed to maintain water service during construction, minimize shutdowns, and maintain public access around the site.